National projects
249projects
₱5.55Bin all
46ongoing
2slow
- Flood control ₱3.11B
- Roads and bridges ₱1.45B
- Buildings ₱561.8M
- Schools ₱320.0M
- Water ₱99.4M
- Other ₱10.1M
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
TUBIGAN BUILDERS47 projects · ₱223.1M
2
PABLO S. LABASBAS CONSTRUCTION CORPORATION43 projects · ₱568.1M
3
888 ACY ENTERPRISES13 projects · ₱686.7M
4
TWO-BROTHERS CONSTRUCTION13 projects · ₱65.7M
5
A.C. RIVERO DEVELOPMENT CORPORATION9 projects · ₱228.2M