Taft: Government

Municipality in Eastern Samar, Eastern Visayas, Visayas · 24 barangays

National projects

Built by DPWH in Taft since 2016.

133projects
₱4.52Bin all
43ongoing
2slow
  • Roads and bridges ₱3.46B
  • Flood control ₱698.4M
  • Buildings ₱251.9M
  • Schools ₱107.2M
  • Water ₱3.8M

Showing 31 to 60 of 133

₱5.0MCompleted · 100%
Construction of road phase ii, Brgy. lumatod - danao Roads and bridges · 2024 · CHRIZMARIE BUILDERS AND CONSTRUCTION SUPPLY
₱96.4MOn-Going · 100%
Construction of flood control structure (seawall), Barangay 01 poblcacion Flood control · 2024 · AQUALINE CONSTRUCTION CORPORATION
₱98.9MOn-Going · 98%
Construction of road phase ii, Brgy. polangi - gayam, Eastern samar ld Roads and bridges · 2024 · CHRIZMARIE BUILDERS AND CONSTRUCTION SUPPLY
₱96.4MOn-Going · 90%
Construction of drainage canal system, Barangay gayam, Municipality of taft Flood control · 2024 · TWO-BROTHERS CONSTRUCTION
₱14.6MOn-Going · 6%Slow
Construction of flood control structure along taft river, Barangay san pablo Flood control · 2024 · AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129)
₱191.9MOn-Going · 84%
₱9.8MCompleted · 100%
Construction of multi-purpose building, Brgy. dacul Buildings · 2023 · AICON INDUSTRIES
₱4.9MCompleted · 100%
Preventive maintenance - secondary roads - wright - taft - borongan rd (s00173sm) k0895+285 - k0901+670 Roads and bridges · 2024 · GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914) / R.B. ABITAL CONSTRUCTION CORP.
₱192.7MOn-Going · 86%
Construction of flood control structure along taft river, Barangay malinao Flood control · 2024 · ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.
₱188.5MOn-Going · 90%
₱192.9MOn-Going · 91%
₱168.8MOn-Going · 90%
₱168.6MOn-Going · 90%
Construction of evacuation center Buildings · 2024 · DRAGON CONSTRUCTION
₱4.9MOn-Going · 98%
₱96.4MCompleted · 100%
₱19.8MCompleted · 100%
Construction of municipal building Buildings · 2023 · ARNOLD G. COSIPAG CONSTRUCTION
₱29.7MCompleted · 100%
Construction of 1sty2cl, Taft national high school Schools · 2023 · AMANHURAY CONSTRUCTION
₱5.8MCompleted · 100%
Construction of road, Barangay nato - bungdo - pangabutan Roads and bridges · 2023 · PABLO S. LABASBAS CONSTRUCTION CORPORATION
₱48.2MCompleted · 100%
Construction of road, Barangay lumatod - danao - del remedios Roads and bridges · 2023 · CHRIZMARIE BUILDERS AND CONSTRUCTION SUPPLY
₱48.2MCompleted · 100%
Construction of road, Barangay polangi to gayam Roads and bridges · 2023 · QUEEN MARIECRIS CONSTRUCTION CORP.
₱19.3MCompleted · 100%
₱96.3MCompleted · 100%
Construction of drainage system, Barangay poblacion Flood control · 2023 · ST. ROCH CONSTRUCTION
₱9.9MCompleted · 100%
₱4.9MCompleted · 100%
₱24.0MCompleted · 100%
₱4.0MCompleted · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Taft since 2016.

1
PABLO S. LABASBAS CONSTRUCTION CORPORATION22 projects · ₱561.8M
2
TUBIGAN BUILDERS15 projects · ₱115.1M
3
YFL BUILDERS8 projects · ₱30.2M
4
TWO-BROTHERS CONSTRUCTION7 projects · ₱90.4M
5
MAGA CONSTRUCTION AND SUPPLIES INC.7 projects · ₱20.0M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →