Taft: Government

Municipality in Eastern Samar, Eastern Visayas, Visayas · 24 barangays

National projects

Built by DPWH in Taft since 2016.

133projects
₱4.52Bin all
43ongoing
2slow
  • Roads and bridges ₱3.46B
  • Flood control ₱698.4M
  • Buildings ₱251.9M
  • Schools ₱107.2M
  • Water ₱3.8M

Showing 1 to 30 of 43

₱4.9MOn-Going · 27%
Construction of municipal building, Phase iii Buildings · 2026 · TUBIGAN BUILDERS
₱47.6MOn-Going · 3%
₱4.9MOn-Going · 10%
₱4.8MOn-Going · 27%
₱4.8MOn-Going · 32%
₱4.8MOn-Going · 33%
₱4.8MOn-Going · 33%
₱48.0MOn-Going · 32%
₱67.1MOn-Going · 64%
Construction of flood control structures at brgy. san rafael along taft river Flood control · 2025 · B. VICENCIO BUILDERS (BVB), INC.
₱48.2MOn-Going · 90%
Construction of road, Sitio tabok, Barangay nato Roads and bridges · 2025 · AMANHURAY CONSTRUCTION
₱19.2MOn-Going · 99%
Widening - secondary roadsjct. taft - oras - san policarpo - arteche rd (s00167sm), K0965+923 - k0968+000, K0968+537 - k0969+749 Roads and bridges · 2025 · A3 CONSTRUCTION & SUPPLY / SISBRO CONSTRUCTION CORPORATION
₱119.7MOn-Going · 100%
₱104.8MOn-Going · 99%
Construction of multi-purpose building (evacuation center), Barangay san luis Buildings · 2025 · PABLO S. LABASBAS CONSTRUCTION CORPORATION
₱9.8MOn-Going · 99%
Construction of multi-purpose building, Taft municipal hall phase 2, Barangay poblacion Buildings · 2025 · PABLO S. LABASBAS CONSTRUCTION CORPORATION
₱48.9MOn-Going · 94%
Construction of road, Phase 2, Barangay nato - barangay bongdo Roads and bridges · 2025 · PABLO S. LABASBAS CONSTRUCTION CORPORATION
₱48.2MOn-Going · 78%
Construction of road, Barangay batiawan - barangay pangabutan Roads and bridges · 2025 · CHRIZMARIE BUILDERS AND CONSTRUCTION SUPPLY
₱28.9MOn-Going · 43%
Construction of multi-purpose building barangay san pablo Buildings · 2024 · AMANHURAY CONSTRUCTION
₱14.8MOn-Going · 100%
Construction of road, Phase i, Brgy. 6 - sitio palaspas to brgy. polangi, Eastern samar ld Roads and bridges · 2024 · PABLO S. LABASBAS CONSTRUCTION CORPORATION
₱48.1MOn-Going · 77%
Construction of road phase ii, Brgy. lumatod - danao Roads and bridges · 2024 · CHRIZMARIE BUILDERS AND CONSTRUCTION SUPPLY
₱96.4MOn-Going · 100%
Construction of flood control structure (seawall), Barangay 01 poblcacion Flood control · 2024 · AQUALINE CONSTRUCTION CORPORATION
₱98.9MOn-Going · 98%
Construction of road phase ii, Brgy. polangi - gayam, Eastern samar ld Roads and bridges · 2024 · CHRIZMARIE BUILDERS AND CONSTRUCTION SUPPLY
₱96.4MOn-Going · 90%
Construction of drainage canal system, Barangay gayam, Municipality of taft Flood control · 2024 · TWO-BROTHERS CONSTRUCTION
₱14.6MOn-Going · 6%Slow
Construction of flood control structure along taft river, Barangay san pablo Flood control · 2024 · AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129)
₱191.9MOn-Going · 84%
Preventive maintenance - secondary roads - wright - taft - borongan rd (s00173sm) k0895+285 - k0901+670 Roads and bridges · 2024 · GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914) / R.B. ABITAL CONSTRUCTION CORP.
₱192.7MOn-Going · 86%
Construction of flood control structure along taft river, Barangay malinao Flood control · 2024 · ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.
₱188.5MOn-Going · 90%
₱192.9MOn-Going · 91%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Taft since 2016.

1
PABLO S. LABASBAS CONSTRUCTION CORPORATION22 projects · ₱561.8M
2
TUBIGAN BUILDERS15 projects · ₱115.1M
3
YFL BUILDERS8 projects · ₱30.2M
4
TWO-BROTHERS CONSTRUCTION7 projects · ₱90.4M
5
MAGA CONSTRUCTION AND SUPPLIES INC.7 projects · ₱20.0M