PA
Palo: Government
Municipality in Leyte, Eastern Visayas, Visayas · 33 barangays
National projects
350projects
₱15.28Bin all
61ongoing
10slow
- Flood control ₱8.10B
- Roads and bridges ₱4.37B
- Buildings ₱2.51B
- Schools ₱275.5M
- Other ₱10.5M
- Water ₱9.9M
Showing 61 to 90 of 350
Construction/upgrading/rehabilitation of drainage along national roads - tertiary roads - sn jose-manlurip-macarthur park rd - k0913+726 - k0914+074, K0914+149 - k0914+761
Roads and bridges · 2024 · AQUALINE CONSTRUCTION CORPORATION
₱52.8MOn-Going · 70%
Construction of tanauan by-pass road, Leyte brgy. camire, Tanauan to brgy. cabarasan guti
Roads and bridges · 2024 · JELM CONSTRUCTION CORP.
₱144.6MOn-Going · 51%Slow
Preventive maintenance - primary roads - palo-carigara-ormoc road, K0918+006- k0918 +743
Roads and bridges · 2024 · R8 ASPHALT PLANT AND CONSTRUCTION INC.
₱29.2MCompleted · 100%
Preventive maintenance - secondary roads - government center road network - k0913+(-157) - k0913+395
Roads and bridges · 2024 · R8 ASPHALT PLANT AND CONSTRUCTION INC.
₱22.1MCompleted · 100%
Rehabilitation/major repair of permanent bridges, Canbanwa bridge (b00043lt) along palo-carigara-ormoc road
Roads and bridges · 2024 · DC BROS BUILDERS AND TRADING
₱998KCompleted · 100%
Construction of by-pass and diversion roads - tacloban - palo diversion road including drainage system, Package a-2
Flood control · 2024 · EZJONES CONSTRUCTION INC.
₱115.7MOn-Going · 98%
Construction of road (phase 2), Brgy. canhidoc
Roads and bridges · 2024 · G.O.C. BUILDERS
₱29.4MCompleted · 100%
Improvement/expansion of laboratory, Gov. benjamin t. romualdez general hospital and schistosomiasis center
Buildings · 2023 · PAFJ CONSTRUCTION AND SUPPLY, INC.
₱14.8MOn-Going · 47%Slow
Construction of multi-purpose building (barangay hall), Brgy. castilla
Buildings · 2024 · KAUIE BUILDERS & SUPPLIES INC.
₱6.7MCompleted · 100%
Preventive maintenance - primary roads - san jose-manlurip-macarthur park rd - k0914+307 - k0914+696
Roads and bridges · 2024 · R8 ASPHALT PLANT AND CONSTRUCTION INC.
₱11.8MCompleted · 100%
Construction of flood control structure (drainage system), Phase 1, Barangay canhidoc
Flood control · 2024 · G.O.C. BUILDERS
₱19.8MCompleted · 100%
Construction of flood control structure along sambulawan river (downstream), Brgy. pawing
Flood control · 2024 · JELM CONSTRUCTION CORP.
₱97.0MOn-Going · 85%
Construction of multi-purpose building, Barangay cangumbang
Buildings · 2024 · TRIAD A BUILDERS INCORPORATED
₱4.9MOn-Going · 0%Slow
Improvement of multi-purpose building (phase 2), Schistosomiasis hospital
Buildings · 2023 · ZGPL CONSTRUCTION
₱19.6MCompleted · 100%
Construction of flood control structure, Brgy. san joaquin
Flood control · 2024 · COLLERA CONSTRUCTION / PYUKEI CONSTRUCTION INC.
₱144.7MOn-Going · 70%
Construction of flood control structure along san isidro river, Brgy. libertad
Flood control · 2024 · AQUALINE CONSTRUCTION CORPORATION
₱41.5MCompleted · 100%
Construction of road, Zone 2 and 3, Brgy. tacuranga
Roads and bridges · 2024 · WAWOT BUILDERS
₱12.2MCompleted · 100%
Construction/maintenance of flood mitigation structures and drainage system - construction of embarkadero flood control structure along bahay river, (downstream)
Flood control · 2024 · MAMSAR CONSTRUCTION AND INDUSTRIAL CORPORATION
₱159.8MOn-Going · 100%
Construction of embarkadero flood control along bahay river
Flood control · 2023 · JJ PALACIO CONSTRUCTION
₱47.5MCompleted · 100%
Construction of dpwh leyte first district engineering office building, Brgy. pawing
Buildings · 2024 · WAY MAKER GENERAL CONTRACTOR OPC ([REVOKED] 52351)
₱19.8MCompleted · 100%
Construction (completion) of dpwh regional office viii building, Equipment management division (emd), Barangay pawing, Leyte (phase ii), Leyte 1st l.d.
Buildings · 2024 · AQUALINE CONSTRUCTION CORPORATION
₱48.2MOn-Going · 87%
Construction of libertad flood control structure along bangon river, Barangay libertad
Flood control · 2024 · LEDA CONSTRUCTION INCORPORATED
₱160.5MCompleted · 100%
Construction of bangon flood control structure along bangon river, Barangay san jose (phase 2)
Flood control · 2024 · EZJONES CONSTRUCTION INC. / MWJ CONSTRUCTION
₱169.7MOn-Going · 91%
Construction of tacloban - palo diversion road including drainage system, Package a-1, Barangay campetic
Flood control · 2024 · EZJONES CONSTRUCTION INC.
₱289.3MOn-Going · 98%
Construction of flood control structure (drainage system and flood water impounding area), Brgy. cangumbang
Flood control · 2024 · FAIRCHILD BUILDERS & DEVELOPERS, INC. / GO_SOLID BUILDERS INC.
₱98.9MCompleted · 100%
Construction/improvement of access roads leading to declared tourism destinations (tourism road infrastructure program - trip) - guindapunan-baras road leading to macarthur leyte landing memorial park, Brgy. guindapunan
Roads and bridges · 2024 · G.O.C. BUILDERS
₱4.9MCompleted · 100%
Construction of flood control structure (drainage system), Phase 2, Brgy. canhidoc
Flood control · 2024 · G.O.C. BUILDERS
₱29.7MCompleted · 100%
Construction of flood control structure along sambulawan river (upstream), Brgy. pawing
Flood control · 2024 · JELM CONSTRUCTION CORP.
₱99.0MOn-Going · 72%
Construction/rehabilitation of flood mitigation facilities within major river basins and principal rivers- construction of flood control along binahaan river, Brgy. san joaquin
Flood control · 2024 · KAUIE BUILDERS & SUPPLIES INC.
₱96.4MCompleted · 100%
Construction of multi-purpose building, Denr-penro leyte, Barangay baras
Buildings · 2024 · QUELLING CONSTRUCTION
₱14.7MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
AQUALINE CONSTRUCTION CORPORATION28 projects · ₱1.33B
2
G.O.C. BUILDERS16 projects · ₱252.9M
3
JELM CONSTRUCTION CORP.12 projects · ₱888.7M
4
R8 ASPHALT PLANT AND CONSTRUCTION INC.10 projects · ₱210.2M
5
EZJONES CONSTRUCTION INC. / MWJ CONSTRUCTION8 projects · ₱903.5M