CA
Calbiga: Government
Municipality in Samar, Eastern Visayas, Visayas · 41 barangays
National projects
68projects
₱2.26Bin all
19ongoing
0slow
- Roads and bridges ₱1.25B
- Flood control ₱809.7M
- Schools ₱112.5M
- Buildings ₱68.9M
- Water ₱22.8M
Showing 1 to 30 of 46
Const. (completion of multi- purpose building, Brgy. polangi
Buildings · 2024 · H.A.H. REVERIE CONSTRUCTION CORP.
₱3.0MCompleted · 100%
Const. (completion) of multi-purpose building, Brgy. pasigay
Buildings · 2024 · H.A.H. REVERIE CONSTRUCTION CORP.
₱3.0MCompleted · 100%
Const. (completion) of multi-purpose building (municipal legislative building), Brgy. 1
Buildings · 2024 · BCG DESIGN AND CONSTRUCTION
₱4.9MCompleted · 100%
Construction of rainwater collection system (rwcs), Barobaybay es
Water · 2023 · BCG DESIGN AND CONSTRUCTION
₱393KCompleted · 100%
Construction of rainwater collection system (rwcs), Panayuran es
Water · 2023 · BCG DESIGN AND CONSTRUCTION
₱387KCompleted · 100%
Construction of rainwater collection system (rwcs), Pasigay es
Water · 2023 · BCG DESIGN AND CONSTRUCTION
₱393KCompleted · 100%
Retrofitting/strengthening of permanent bridges cabugao br. (b00385sm) along daang maharlika (sm) (sn isidro - sn juanico br.)
Roads and bridges · 2023 · ETAN CONSTRUCTION
₱9.8MCompleted · 100%
Retrofitting/strengthening of permanent bridges, Polangi br. (b00386sm) along daang maharlika (sm) (sn isidro - sn juanico br.)
Roads and bridges · 2023 · ETAN CONSTRUCTION
₱9.8MCompleted · 100%
Construction of flood control along calbiga river
Flood control · 2023 · EBS CONSTRUCTION AND SUPPLIES
₱111.0MCompleted · 100%
Construction of rain water collection system (rwcs), Calingonan e/s, Brgy. calingonan
Water · 2021 · MAGA CONSTRUCTION AND SUPPLIES INC.
₱325KCompleted · 100%
Construction of rain water collection system (rwcs), Timbangan e/s, Brgy. timbangan
Water · 2021 · MAGA CONSTRUCTION AND SUPPLIES INC.
₱322KCompleted · 100%
Construction of rain water collection system (rwcs), Patong e/s, Brgy. patong
Water · 2021 · MAGA CONSTRUCTION AND SUPPLIES INC.
₱327KCompleted · 100%
Construction of multi-purpose building, Brgy. barobaybay
Buildings · 2022 · ETAN CONSTRUCTION
₱4.9MCompleted · 100%
Construction of calbiga flood control along calbiga
Flood control · 2021 · EMB CONSTRUCTION AND SUPPLY
₱22.1MCompleted · 100%
Construction/improvement of access roads leading to declared tourism destinations (tourism road infrastructure program-trip)-access road from brgy. polangi-brgy. panayuran-brgy. literon leading to lulugayan falls, Calbiga river and ...... calbiga samar
Flood control · 2021 · CDU CONSTRUCTION / RICHMARK CONSTRUCTION, INC.
₱102.7MCompleted · 100%
Construction of local road, Mahangcao to buluan
Roads and bridges · 2020 · TOM BUILDERS AND SUPPLY
₱18.9MCompleted · 100%
Construction of senior citizens multi-purpose building
Buildings · 2020 · G. BUILDERS
₱4.9MCompleted · 100%
Construction of evacuation center, Barangay tinago
Buildings · 2020 · 6RM CONSTRUCTION AND DEVT. CORP.
₱34.7MCompleted · 100%
Widening of permanent bridge, Polangi bridge (b00386sm) along daang maharlika (sm) (sn isidro - sn juanico br.), K0848+1066
Roads and bridges · 2020 · RICHMARK CONSTRUCTION, INC.
₱29.3MCompleted · 100%
Widening of permanent weak bridges, Cabugao bridge (b00385sm) along daang maharlika (sm) (sn isidro - sn juanico br)
Roads and bridges · 2020 · LEDA CONSTRUCTION INCORPORATED
₱33.6MCompleted · 100%
Construction of modified design with parapet, 1-storey, 2-cl. school bldg., Canbagtic es
Schools · 2019 · AG VALENCIANO CONSTRUCTION
₱4.4MCompleted · 100%
Consturction of calbiga flood control along calbiga river
Flood control · 2020 · CDU CONSTRUCTION / RICHMARK CONSTRUCTION, INC.
₱36.8MCompleted · 100%
Construction of multi-purpose bldg. (phase i), Brgy. literon
Buildings · 2020 · STEVEN CONSTRUCTION & SUPPLY
₱2.5MCompleted · 100%
Construction of multi-purpose bldg. (phase i), Brgy. timbangan
Buildings · 2020 · STEVEN CONSTRUCTION & SUPPLY
₱2.5MCompleted · 100%
Construction of multi-purpose bldg., Brgy. pasigay
Buildings · 2020 · STEVEN CONSTRUCTION & SUPPLY
₱933KCompleted · 100%
Const. of modified design with parapet, 1-storey, 2-cl school building, Borong e/s
Schools · 2019 · HEROES CONSTRUCTION AND SUPPLY
₱4.4MCompleted · 100%
Const. of modified design with parapet, 1-storey, 2-cl school building, Sinalangtan e/s
Schools · 2019 · 5 STAR J ENTERPRISES
₱4.4MCompleted · 100%
Const. of modified design with parapet, 2-storey, 4-cl school building, Bacyaran e/s/
Schools · 2019 · YFL BUILDERS
₱12.6MCompleted · 100%
Const. of modified design with parapet, 1-storey, 2-cl school building, Upper minata e/s/
Schools · 2019 · JLU BUILDING AND DESIGN SERVICES
₱4.4MCompleted · 100%
Const. of modified design with parapet, 1-storey, 2-cl school building, San mauricio e/s/
Schools · 2019 · SEGUA CONSTRUCTION AND ENTERPRISES
₱4.3MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
Who builds here
1
ETAN CONSTRUCTION11 projects · ₱339.3M
2
BCG DESIGN AND CONSTRUCTION6 projects · ₱45.0M
3
CDU CONSTRUCTION3 projects · ₱115.8M
4
H.A.H. REVERIE CONSTRUCTION CORP.3 projects · ₱8.9M
5
STEVEN CONSTRUCTION & SUPPLY3 projects · ₱5.8M