Built by DPWH in Bais City since 2016.

298projects
₱5.24Bin all
30ongoing
2slow
  • Roads and bridges ₱2.69B
  • Flood control ₱1.96B
  • Schools ₱404.5M
  • Buildings ₱162.8M
  • Water ₱19.9M

Showing 1 to 30 of 298

Repair/rehabilitation of classrooms, Tacalan es Schools · 2025 · DQMB CONSTRUCTION & SUPPLY CORP.
₱2.2MOn-Going · 74%
Construction of road, Sta. 0+000 -sta. 0+366, Barangay lonoy Roads and bridges · 2026 · ASHLEYKA CONSTRUCTION AND SUPPLIES CORP.
₱7.4MOn-Going · 0%
Construction of road, Sta. 0+000 -sta. 0+307.5, Barangay sab-ahan Roads and bridges · 2026 · A. CABIJE CONSTRUCTION SERVICES AND SUPPLY CORP.
₱8.4MOn-Going · 0%
₱5.9MOn-Going · 0%
₱4.1MOn-Going · 0%
Construction of road, Sta. 0+000 - sta. 0+477, Barangay looc Roads and bridges · 2026 · H.L.J CONSTRUCTION & ENTERPRISES
₱14.4MOn-Going · 79%
₱27.9MOn-Going · 30%
Repair/rehabilitation of classrooms, Tabuac es Schools · 2025 · MG CONSTRUCTION
₱4.5MOn-Going · 94%
₱18.1MOn-Going · 100%
Construction of three (3) storey six (6) classrooms school building at basak integrated school Schools · 2025 · R.E. SINGSON CONSTRUCTION AND DEVELOPMENT INC.
₱19.6MOn-Going · 47%
Construction of road from sitio tabuac to cascading tathi falls, Negro Roads and bridges · 2025 · UY CONDEV CORPORATION
₱48.3MOn-Going · 21%
₱38.4MCompleted · 100%
₱37.9MCompleted · 100%
Construction/maintenance of flood mitigation structures and drainage systems - construction of flood control structure, Canlumbog river, Ne Flood control · 2025 · C.T. LEONCIO CONSTRUCTION & TRADING / S-ANG CONSTRUCTION & GENERAL TRADING, INC.
₱141.2MOn-Going · 55%
Construction/maintenance of flood mitigation structures and drainage systems-rehabilitation of flood control structure (right side), Barangay cabanlutan, Ba Flood control · 2025 · C.T. LEONCIO CONSTRUCTION & TRADING / S-ANG CONSTRUCTION & GENERAL TRADING, INC.
₱141.1MOn-Going · 50%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Bais City since 2016.

1
PHILSOUTH BUILDERS INC32 projects · ₱1.18B
2
ASHLEYKA CONSTRUCTION AND SUPPLIES CORP.32 projects · ₱165.9M
3
MG CONSTRUCTION21 projects · ₱109.5M
4
RICHFIELD BUILDERS, INC.17 projects · ₱164.0M
5
RACCT CONSTRUCTION AND TRADING16 projects · ₱67.1M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →