Official seal of Roxas City

Roxas City: Government

City in Capiz, Western Visayas, Visayas · 47 barangays

National projects

Built by DPWH in Roxas City since 2016.

165projects
₱3.09Bin all
39ongoing
4slow
  • Buildings ₱1.54B
  • Roads and bridges ₱1.26B
  • Flood control ₱204.5M
  • Schools ₱93.6M

Showing 31 to 39 of 39

Construction of flood control structures along visayan sea (phase 2), Brgy. punta cogon Flood control · 2022 · MEGAGOLD CONSTRUCTION AND DEVELOPMENT, OPC
₱29.1MOn-Going · 96%
Roxas city circumferential road, C2 Roads and bridges · 2021 · ROPRIM CONSTRUCTION CORPORATION
₱120.5MOn-Going · 100%
Construction of concrete road - roxas city airport bypass road Roads and bridges · 2022 · KIRSKAT VENTURE
₱22.8MOn-Going · 100%
Roxas city circumferential road, C1, Section Roads and bridges · 2022 · IBC INTERNATIONAL BUILDERS CORPORATION
₱72.4MOn-Going · 100%
₱59.4MOn-Going · 62%
Roxas city circumferential road-c1 (section 1) Roads and bridges · 2021 · IBC INTERNATIONAL BUILDERS CORPORATION
₱70.4MOn-Going · 33%Slow
₱16.1MOn-Going · 81%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Roxas City since 2016.

1
MBM CONSTRUCTION21 projects · ₱90.2M
2
NANA BUILDERS14 projects · ₱127.7M
3
IBC INTERNATIONAL BUILDERS CORPORATION10 projects · ₱309.2M
4
KIRSKAT VENTURE10 projects · ₱128.1M
5
SDB STEELSTRUCT BUILDERS ENTERPRISES9 projects · ₱54.1M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →