Official seal of San Pedro City

San Pedro City: Government

City in Laguna, Calabarzon, Luzon · 27 barangays

National projects

Built by DPWH in San Pedro City since 2016.

299projects
₱7.27Bin all
43ongoing
10slow
  • Flood control ₱4.23B
  • Roads and bridges ₱1.38B
  • Buildings ₱1.02B
  • Schools ₱439.2M
  • Other ₱152.3M
  • Water ₱38.4M

Showing 1 to 30 of 299

Construction of multi-purpose building, Barangay fatima Buildings · 2025 · MAR-VEL CONSTRUCTION & SUPPLY
₱7.3MOn-Going · 100%
₱4.9MOn-Going · 0%
₱94.9MOn-Going · 36%
Construction/completion of multi-purpose building at barangay bagong silang Buildings · 2025 · BHENLLABIEN BUILDERS CORPORATION
₱4.9MCompleted · 100%
₱48.2MOn-Going · 100%
Construction of multi-purpose building, Barangay narra Buildings · 2025 · D.T. RECIO INCORPORATED
₱19.4MOn-Going · 34%
Construction of multi-purpose building, Barangay chrysanthemum Buildings · 2025 · MICLOVER GENERAL CONSTRUCTION & IRON WORKS
₱9.7MCompleted · 100%
Construction of multi-purpose building, Barangay langgam Buildings · 2025 · BHENLLABIEN BUILDERS CORPORATION
₱7.3MOn-Going · 7%
Rehabilitation of multi-purpose building (covered court), Barangay magsaysay Buildings · 2025 · BHENLLABIEN BUILDERS CORPORATION
₱7.3MOn-Going · 86%
Construction of structure for river protection at saint joseph village Flood control · 2025 · GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914)
₱47.7MOn-Going · 0%
Construction of multi-purpose building, Barangay pacita 2 Buildings · 2025 · MAR-VEL CONSTRUCTION & SUPPLY
₱9.7MCompleted · 100%
Construction of multi-purpose building, Barangay san roque Buildings · 2025 · MAR-VEL CONSTRUCTION & SUPPLY
₱46.2MOn-Going · 100%
Construction of multi-purpose building, Barangay sampaguita Buildings · 2025 · N.B. AVILA CONSTRUCTION AND TRADING CORP.
₱7.3MCompleted · 100%
Construction (completion) of multi-purpose building (covered court), Barangay nueva Buildings · 2025 · N.B. AVILA CONSTRUCTION AND TRADING CORP.
₱4.9MCompleted · 100%
Construction (completion) of multi-purpose building, Barangay calendola Buildings · 2025 · N.B. AVILA CONSTRUCTION AND TRADING CORP.
₱7.3MOn-Going · 100%
Construction of structure for river protection along tunasan river, Near la marea Flood control · 2025 · BHENLLABIEN BUILDERS CORPORATION
₱47.6MOn-Going · 0%
Construction of river protection structure near bayanbayanan bridge upstream, Phase 2 Flood control · 2025 · YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. ([REVOKED] 45002)
₱39.5MTerminated · 100%
Construction of river protection structure near southpeak bridge Flood control · 2025 · D.T. RECIO INCORPORATED
₱93.9MOn-Going · 0%
Construction of river protection structure, Park spring village Flood control · 2025 · AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129)
₱94.0MOn-Going · 15%
Construction of river protection structure, Landayan creek near boundary Flood control · 2025 · AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129)
₱38.7MOn-Going · 38%
Construction of river protection structure along tunasan river, Near slex upstream Flood control · 2025 · BHENLLABIEN BUILDERS CORPORATION
₱141.3MOn-Going · 4%
Construction of river protection structure, Park spring village, Phase 2 Flood control · 2025 · ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.
₱94.0MOn-Going · 73%
Construction of river protection structure, Bayanbayanan bridge upstream, Laquna Flood control · 2025 · AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129)
₱94.2MOn-Going · 90%
Construction of river protection structure, Near yakal bridge Flood control · 2025 · ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.
₱47.7MOn-Going · 96%
₱9.7MOn-Going · 16%
₱5.8MCompleted · 100%
Construction of multi-purpose building, Barangay rosario Buildings · 2024 · MICLOVER GENERAL CONSTRUCTION & IRON WORKS
₱4.8MOn-Going · 77%
Construction of multi-purpose building, Barangay sto. nino Buildings · 2024 · MICLOVER GENERAL CONSTRUCTION & IRON WORKS
₱9.9MOn-Going · 29%
Construction of multi-purpose building, Barangay sampaguita Buildings · 2024 · MICLOVER GENERAL CONSTRUCTION & IRON WORKS
₱4.8MCompleted · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in San Pedro City since 2016.

1
11 DIAMOND EAGLE CONSTRUCTION CORPORATION43 projects · ₱491.2M
2
MICLOVER GENERAL CONSTRUCTION & IRON WORKS27 projects · ₱286.4M
3
DATZLAV CONSTRUCTION21 projects · ₱220.8M
4
MAR-VEL CONSTRUCTION & SUPPLY16 projects · ₱823.1M
5
EOZ CONSTRUCTION12 projects · ₱114.2M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →