National projects
419projects
₱10.07Bin all
27ongoing
2slow
- Flood control ₱4.99B
- Roads and bridges ₱4.05B
- Schools ₱499.1M
- Buildings ₱449.1M
- Water ₱61.0M
- Other ₱15.8M
Showing 211 to 240 of 419
Construction of riverbank protection (revetment) along tamontaka river (tamontaka 1 to tamontaka 2 section, Phase iv)
Flood control · 2019 · ARS CONSTRUCTION AND SUPPLY
₱4.7MCompleted · 100%
Construction of riverbank protection (revetment) along tamontaka river (tamontaka 1 to tamontaka 2 section, Phase v)
Flood control · 2019 · JIBRAN CONSTRUCTION
₱1.9MCompleted · 100%
Construction of riverbank protection along rio grande de mindanao (kalanganan to bucana section, Phase ii)
Flood control · 2019 · R.B. ALCAZAR CONSTRUCTION CORP.
₱20.8MCompleted · 100%
Construction of riverbank protection (revetment) along tamontaka river (tamontaka 1 to tamontaka 2 section, Phase ii)
Flood control · 2019 · ARS CONSTRUCTION AND SUPPLY
₱6.6MCompleted · 100%
Construction of riverbank protection along rio grande de mindanao, (kalanganan to bucana section, Phase i)
Flood control · 2019 · ABU CONSTRUCTION
₱23.8MCompleted · 100%
Construction of riverbank protection (revetment) along tamontaka river (downstream) phase v, Tamontaka mother
Flood control · 2019 · ABU CONSTRUCTION
₱25.6MCompleted · 100%
Construction of riverbank protection (revetment) along tamontaka river (tamontaka 1 to tamontaka 2 section, Phase i
Flood control · 2019 · ABU CONSTRUCTION
₱23.6MCompleted · 100%
Construction of river bank protection (revetment), Sta. 0+000 to sta. 0+745 along tamontaka river
Flood control · 2019 · GEMMA CONSTRUCTION SUPPLY, INC.
₱140.4MCompleted · 100%
Construction of multi-purpose building, Brgy. poblacion iv
Buildings · 2019 · ANGKAT CONSTRUCTION AND SUPPLIES
₱2.4MCompleted · 100%
Construction of riverbank protection (revetment) along esteros river-downstream, Phase ii
Flood control · 2019 · ABU CONSTRUCTION
₱23.5MCompleted · 100%
Construction of multi-purpose building, Brgy. bagua iii
Buildings · 2019 · JIBRAN CONSTRUCTION
₱2.3MCompleted · 100%
Reconstruction with 280mm slab at cotabato-allah valley-marbel road k1849+116-k1849+229
Roads and bridges · 2019 · ARS CONSTRUCTION AND SUPPLY
₱3.3MCompleted · 100%
Construction of drainage canal at brgy. rh vii
Flood control · 2019 · MASH BUILDER'S AND CONSTRUCTION
₱4.6MCompleted · 100%
Construction of road, Brgy. rh vii
Roads and bridges · 2019 · MASH BUILDER'S AND CONSTRUCTION
₱4.9MCompleted · 100%
Construction of 1) 2-storey 6 cl school building and 2) 2-storey 4 cl school building, All in ccnhs-annex bubong site
Schools · 2018 · STONELINE CONSTRUCTION
₱25.9MCompleted · 100%
Construction of multi-purpose building brgy. kalanganan ii
Buildings · 2018 · JIBRAN CONSTRUCTION
₱11.1MCompleted · 100%
Construction of standard 2-storey 6 cl school building at ccnhs-annex buaya-buaya site
Schools · 2018 · SCP CONSTRUCTION
₱13.8MCompleted · 100%
Construction of standard 4-storey 20 cl school building stand alone shs tamontaka mother
Schools · 2018 · BAMEC DEVELOPERS / MM MASULOT CONSTRUCTION CORPORATION
₱71.7MCompleted · 100%
Construction of kakar riprap/riverbank protection of brgy. poblacion 8 (left side)
Flood control · 2018 · GEMMA CONSTRUCTION SUPPLY, INC.
₱47.5MCompleted · 100%
Construction of kakar riprap/riverbank protection of brgy. poblacion 8 (right side)
Flood control · 2018 · GEMMA CONSTRUCTION SUPPLY, INC.
₱47.5MCompleted · 100%
Construction of lisbong river riprap/riverbank protection (tamontaka 4, Left side)
Flood control · 2018 · CS CONST. AND SUPPLY INC.
₱48.7MCompleted · 100%
Construction of lisbong river riprap/riverbank protection (tamontaka 4, Downstream left side)
Flood control · 2018 · CS CONST. AND SUPPLY INC.
₱48.6MCompleted · 100%
Construction of lisbong river riprap/riverbank protection (tamontaka 4, Right side)
Flood control · 2018 · CS CONST. AND SUPPLY INC.
₱48.6MCompleted · 100%
Construction of lisbong river riprap/riverbank protection (tamontaka 4, Downstream right side)
Flood control · 2018 · CS CONST. AND SUPPLY INC. / MINROCK MULTI-BUILDERS
₱48.5MCompleted · 100%
Concreting of sitio buaya-buaya seashore fmr, Brgy. kalanganan ii
Roads and bridges · 2018 · BRE CONSTRUCTION
₱23.9MCompleted · 100%
Construction of level ii water system of brgy. kalanganan 2
Water · 2018 · JTA BUILDERS
₱27.9MCompleted · 100%
Concreting of road, Brgy. tamontaka mother
Roads and bridges · 2018 · BRE CONSTRUCTION
₱12.5MCompleted · 100%
Construction/concreting of sitio buya-buaya kalanganan ii fmr, Brgy. kalanganan ii
Roads and bridges · 2018 · BRE CONSTRUCTION
₱8.2MCompleted · 100%
Access road leading to tamontaka mother to rosary heights 10, Cotabato city circumferential road to people's palace section, Including bridge
Roads and bridges · 2018 · BRE CONSTRUCTION
₱46.5MCompleted · 100%
Construction of senior citizen building
Buildings · 2018 · MUST ENTERPRISES
₱9.6MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
BRE CONSTRUCTION36 projects · ₱656.6M
2
LLABAN CONSTRUCTION & SUPPLY16 projects · ₱426.3M
3
STONELINE CONSTRUCTION16 projects · ₱127.5M
4
GEMMA CONSTRUCTION SUPPLY, INC.15 projects · ₱1.13B
5
JARGON CONSTRUCTION & SUPPLY15 projects · ₱923.5M