Cotabato City: Government
City in Maguindanao del Norte, Bangsamoro, Mindanao · 37 barangays
National projects
419projects
₱10.07Bin all
27ongoing
2slow
- Flood control ₱4.99B
- Roads and bridges ₱4.05B
- Schools ₱499.1M
- Buildings ₱449.1M
- Water ₱61.0M
- Other ₱15.8M
Showing 241 to 270 of 373
Concreting of brgy. rosary heights iii
Roads and bridges · 2018 · MASH BUILDER'S AND CONSTRUCTION
₱1.5MCompleted · 100%
Concreting of brgy. rosary heights iv
Roads and bridges · 2018 · MASH BUILDER'S AND CONSTRUCTION
₱962KCompleted · 100%
Construction of river bank protection (revetment) along tamontaka river (downstream) phase iv, Tamontaka mother
Flood control · 2018 · ABU CONSTRUCTION
₱46.8MCompleted · 100%
Construction of river bank protection (revetment) at esteros bridge approaches (downstream) along cotabato-ala-marbel road, Sta. 0+000-sta. 0+400 cotabato city side (rh 10)
Flood control · 2018 · ABU CONSTRUCTION
₱46.7MCompleted · 100%
Construction of river bank protection (revetment) at tamontaka mother (downstream) phase iii, Tamontaka river
Flood control · 2018 · ABU CONSTRUCTION
₱46.8MCompleted · 100%
Construction of river bank protection (revetment) at esteros bridge approaches (upstream) along cotabato-ala-marbel road, Sta. 0+000-sta. 0+400 cotabato city side (rh 9)
Flood control · 2018 · ABU CONSTRUCTION
₱46.8MCompleted · 100%
Const. of flood control structure-const. of libungan flood control, Phase v, Upstream of libungan bridge, Poblacion libungan
Flood control · 2018 · LLABAN CONSTRUCTION & SUPPLY
₱27.0MCompleted · 100%
Maintenance road : concrete reblocking-banisilan-guiling-alamada-libungan road, Alamada & libungan
Roads and bridges · 2018 · MUST ENTERPRISES
₱6.2MCompleted · 100%
Concreting of brgy. capayuran road, Capayuran, Pigcawayan
Roads and bridges · 2018 · LLABAN CONSTRUCTION & SUPPLY
₱3.7MCompleted · 100%
Widening of permanent bridges-marbel br. (b00261mn) along paco-roxas-arakan valley-jct davao-bukidnon road, Pres. roxas
Roads and bridges · 2018 · ARN BUILDERS, INC. / ROBETH CONST. AND DEV'T. CORP.
₱73.5MCompleted · 100%
Const. of multi -purpose building, Poblacion public market, Poblacion banisilan
Buildings · 2018 · SAREX BUILDERS AND SUPPLY
₱1.9MCompleted · 100%
Widening of permanent bridges - magpet br. (b00263mn) along paco-roxas-arakan valley-jct davao-bukidnon rd, Pres. roxas
Roads and bridges · 2018 · CS CONST. AND SUPPLY INC. / ROBETH CONST. AND DEV'T. CORP.
₱38.5MCompleted · 100%
Widening of permanent bridges - kingdom hall br. (b00257mn) along paco-roxas-arakan valley-jct davao-bukidnon road kidapawan city
Roads and bridges · 2018 · ROBETH CONST. AND DEV'T. CORP.
₱21.1MCompleted · 100%
Widening of permanent bridges-kinamalig br. (b01778mn) along paco-roxas-arakan valley-jct davao-bukidnon road, Pres. roxas
Roads and bridges · 2018 · LLABAN CONSTRUCTION & SUPPLY
₱18.4MCompleted · 100%
Widening of permanent bridges-binay br. (b00266mn) along paco-roxas-arakan valley-jct davao-bukidnon road, Pres. roxas
Roads and bridges · 2018 · CS CONST. AND SUPPLY INC. / ROBETH CONST. AND DEV'T. CORP.
₱30.8MCompleted · 100%
Widening of permanent bridges-kabacan br. 2(b00264mn) along paco-roxas-arakan valley jct davao-bukidnon road, Pres. roxas
Roads and bridges · 2018 · LLABAN CONSTRUCTION & SUPPLY
₱31.1MCompleted · 100%
Widening of permanent bridges-new cebu br. (b00260mn) along paco-roxas-arakan valley-jct davao-bukidnon road, Pres. roxas
Roads and bridges · 2018 · FFJJ CONSTRUCTION
₱31.9MCompleted · 100%
Retrofitting/strengthening of permanent bridges-kabacan br. 1(b00265mn) along paco-roxas-arakan valley jct. davao-bukidnon road, Pres. roxas
Roads and bridges · 2018 · ARN BUILDERS, INC.
₱36.6MCompleted · 100%
Const. of multi-purpose building, Pedtad kabacan
Buildings · 2018 · BATUA ENGINEERING SERVICES AND CONSTRUCTION SUPPLY
₱1.9MCompleted · 100%
Const. of multi-purpose building, Carmen nhs, Poblacion carmen
Buildings · 2018 · PLUMBS ENGINEERING AND CONSTRUCTION
₱1.8MCompleted · 100%
Completion of school building batch 3 at stand alone shs (tamontaka mother)
Schools · 2017 · BRE CONSTRUCTION
₱28.3MCompleted · 100%
Construction of 2 storey 4 classroom building in mandanas elementary school
Schools · 2017 · MINROCK MULTI-BUILDERS
₱9.0MCompleted · 100%
Construction of 2 storey 6 classroom at datu usman elementary school
Schools · 2017 · MINROCK MULTI-BUILDERS
₱11.9MCompleted · 100%
Construction of 1 storey 2 classroom school building in ccnhs-annex (diocolano site)
Schools · 2017 · MINROCK MULTI-BUILDERS
₱2.6MCompleted · 100%
Cotabato city east diversion road incl. slope protection
Roads and bridges · 2017 · BRE CONSTRUCTION
₱93.9MCompleted · 100%
Construction of 2 storey 4 classroom school building in mokamadali elementary school
Schools · 2017 · BAMEC DEVELOPERS
₱8.3MCompleted · 100%
Proposed 4 storey, 16 classroom at notre dame village national high school
Schools · 2017 · BRE CONSTRUCTION
₱40.0MCompleted · 100%
Construction of 1 storey 2 classroom school building in pagalamatan elementary school
Schools · 2017 · BAMEC DEVELOPERS
₱2.5MCompleted · 100%
Construction of 2 storey 6 classroom at datu ayunan es
Schools · 2017 · ARS CONSTRUCTION AND SUPPLY
₱10.8MCompleted · 100%
Construction of 1 storey 2 classroom school building in diocolano elementary school
Schools · 2017 · MINROCK MULTI-BUILDERS
₱2.6MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
BRE CONSTRUCTION36 projects · ₱656.6M
2
LLABAN CONSTRUCTION & SUPPLY16 projects · ₱426.3M
3
STONELINE CONSTRUCTION16 projects · ₱127.5M
4
GEMMA CONSTRUCTION SUPPLY, INC.15 projects · ₱1.13B
5
JARGON CONSTRUCTION & SUPPLY15 projects · ₱923.5M