Official seal of Cagayan De Oro City

Cagayan De Oro City: Government

City in Northern Mindanao, Mindanao · 80 barangays

Town hall contracts

Construction contracts the town hall of Cagayan De Oro City awarded and posted on PhilGEPS.

1963projects
₱13.32Bin all
  • Roads and bridges ₱2.77B
  • Flood control ₱2.76B
  • Other ₱2.70B
  • Schools ₱2.50B
  • Buildings ₱2.43B
  • Water ₱168.5M
All

Showing 1621 to 1650 of 1,963

Add’l. support for the sheltered vocational center for pwd’s and incorporation of the pdao office; sn 26-2017 Buildings · 2017 · CRIZEL CONSTRUCTION AND CONCRETE PRODUCTS
₱2.0M
Construction of multi-purpose evacuation center (partial) [location calaanan, Canitoan]; sn 25-2017 Buildings · 2017 · CRIZEL CONSTRUCTION AND CONCRETE PRODUCTS
₱5.0M
Declogging of bitan-ag creek (lapasan to nazareth); sn183-2016 Flood control · 2017 · PYRAMID CONSOLIDATED BUILDERS & GENERAL MERCHANDISE
₱6.0M
Construction of agusan national high school drainage system; sn 31 - 2017 Schools · 2017 · JEJOR'S CONSTRUCTION CORPORATION
₱2.0M
Declogging of drainage at santa cruz lapasan Flood control · 2017 · PYRAMID CONSOLIDATED BUILDERS & GENERAL MERCHANDISE
₱745K
Rehabilitation of drainage system at cogon market Flood control · 2017 · JEJOR'S CONSTRUCTION CORPORATION
₱8.6M
Rehabilitation center (location upper puerto); sn 13 - 2017 Buildings · 2017 · IPM CONSTRUCTION AND DEVELOPMENT CORPORATION
₱20.0M
Construction of tuburan water system; sn 14 - 2017 Water · 2017 · WDC BUILDERS AND SUPPLIES
₱1.9M
Construction/rehabilitation of sidewalks along j.r. borja st. & capistrano st. to rizal st., Barangay 11 Other · 2017 · GIMPAB ENTERPRISES
₱436K
Const. of cugman river bank protection struc. (tablon section) Flood control · 2017 · VISTA CONSTRUCTION
₱6.5M
Improvement of drainage along san lucas st. (kauswagan) Flood control · 2017 · L.G. LASACAR CONSTRUCTION
₱996K
Construction of drainage along bonbon brgy. road Flood control · 2017 · L.G. LASACAR CONSTRUCTION
₱996K
Construction of f.s. catanico water system (phase i); sn 15 - 2017 Water · 2017 · TRENCH ENGINEERING AND CONSTRUCTION SERVICES
₱2.0M
Construction of drainage along mandumol-macasandig road Flood control · 2017 · L.G. LASACAR CONSTRUCTION
₱2.0M
Repair & renovation of sanitation inspector’s room (city health office) Other · 2017 · ORO KING BUILDERS AND CONSTRUCTION SUPPLY, INC.
₱230K
Construction of slope protection struc. along san simon Flood control · 2017 · FOOTPRINTS CONSTRUCTION
₱459K
Animal shelter facility Buildings · 2017 · L&L CONSTRUCTION
₱2.4M
Road reblocking of kauswagan-bonbon road Roads and bridges · 2017 · JEJOR'S CONSTRUCTION CORPORATION
₱8.0M
Improvement of water system of brgy. tumpagon; sn 17 - 2017 Water · 2017 · VINNEX ENTERPRISES
₱987K
Const. of umalag river bank protection struc. (tablon section) Flood control · 2017 · VINNEX ENTERPRISES
₱6.5M
Paving of road at zone 10 (carmen) Roads and bridges · 2017 · L&L CONSTRUCTION
₱9.0M
Const. of bigaan river bank protection structure Flood control · 2017 · A.V. PAMATONG TRADING & CONSTRUCTION, INC.
₱15.0M
Rehabilitation of kagay-an resort Other · 2017 · CRIZEL CONSTRUCTION AND CONCRETE PRODUCTS
₱5.0M
Declogging of nha kss main drain, Kauswagan Other · 2017 · CRIZEL CONSTRUCTION AND CONCRETE PRODUCTS
₱8.0M
Construction of sanitary landfill (design & build) Other · 2017 · IPM CONSTRUCTION AND DEVELOPMENT CORPORATION
₱69.9M
Opening of lapasan - san miguel village road with pccp Roads and bridges · 2017 · JORVIVS CONSTRUCTION CORPORATION
₱3.0M
Balubal cdorshp 4 water system Water · 2017 · WDC BUILDERS AND SUPPLIES
₱5.0M
Rehabilitation & closure of cagayan de oro dumpsite (phase iii) Other · 2017 · IPM CONSTRUCTION AND DEVELOPMENT CORPORATION
₱33.6M
Construction of drainage at gk phase 2-b (canitoan) Flood control · 2017 · JORVIVS CONSTRUCTION CORPORATION
₱999K
Road reblocking of carmen-canitoan road Roads and bridges · 2017 · A.V. PAMATONG TRADING & CONSTRUCTION, INC.
₱8.0M

Source: PhilGEPS award notices, from the BetterGov.ph open data (CC0).

Town hall papers

Not every project is on PhilGEPS. These are the town's own reports.

1
Budget and 20% development fundDILG Full Disclosure Policy portal
2
Audit reportsCommission on Audit

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board.

Post on Talk →