National projects
1800projects
₱39.19Bin all
244ongoing
27slow
- Roads and bridges ₱21.80B
- Flood control ₱9.78B
- Buildings ₱5.41B
- Schools ₱1.81B
- Water ₱340.7M
- Other ₱46.1M
Showing 61 to 90 of 244
Rehabilitation/reconstruction of roads with slips, Slope collapse and landslide-secondary roads-cebu balamban transcentral highway-k0009+240-k0009+280
Roads and bridges · 2025 · BNR CONSTRUCTION & DEVELOPMENT CORP.
₱96.4MOn-Going · 62%
Rehabilitation / reconstruction of roads with slips, Slope collapse and landslide - secondary roads- cebu balamban transcentral highway - k0016+786-k0016+902
Roads and bridges · 2025 · VEN RAY CONSTRUCTION CORPORATION
₱94.6MOn-Going · 29%
Construction (completion) of dpwh cebu city district engineering office building
Buildings · 2025 · SB & T CONSTRUCTION OPC
₱24.5MOn-Going · 100%
Concreting of brgy. guba fmr, Brgy. guba
Roads and bridges · 2025 · PLANAC CONSTRUCTION
₱14.6MOn-Going · 100%
Construction/maintenance of flood mitigation structures and drainage systems-construction of flood mitigation structure, Barangay pit-os
Flood control · 2025 · BNR CONSTRUCTION & DEVELOPMENT CORP.
₱58.9MOn-Going · 100%
Preventive maintenance -secondary roads- cebu south coastal rd -(s00134cb)- k0008+(-767)-k0008+000, (s00135cb) k0008+000-k0008+536
Roads and bridges · 2025 · BNR CONSTRUCTION & DEVELOPMENT CORP.
₱86.6MOn-Going · 100%
Construction of by-pass and diversion roads barili - aloguinsan coastal road, Phase 6
Roads and bridges · 2025 · JJ&J CONSTRUCTION AND GENERAL SUPPLY CORPORATION
₱55.8MOn-Going · 81%
Rehabilitation / reconstruction / upgrading of damaged paved roads - secondary roads - cebu-balamban transcentral highway - k0005+(-502) - k0007+000
Roads and bridges · 2025 · KIMWA CONSTRUCTION & DEVELOPMENT CORPORATION / SOCOR CONSTRUCTION CORPORATION
₱101.3MOn-Going · 75%
Construction/rehabilitation of flood mitigation facilities within major river basins and principal rivers-construction of flood mitigation structure along mananga river, Packa
Flood control · 2025 · BNR CONSTRUCTION & DEVELOPMENT CORP. / TRI4 CONSTRUCTION & DEVELOPMENT CORP.
₱95.0MOn-Going · 54%
Construction of revetment along bulacao river, Barangay toong
Flood control · 2025 · ADAMANT DEVELOPMENT CORPORATION / QM BUILDERS
₱38.6MOn-Going · 100%
Construction of concrete bridge, Barangay pobl
Roads and bridges · 2025 · LA PRUEBA CONSTRUCTION / WTG CONSTRUCTION & DEVELOPMENT CORPORATION
₱38.4MOn-Going · 0%
Construction of road with slope protection str
Flood control · 2025 · BNR CONSTRUCTION & DEVELOPMENT CORP.
₱96.3MOn-Going · 62%
Rehabilitation/reconstruction of roads with slips, Slope collapse and landslide-secondary roads-cebu balamban transcentral highway-k0018+420-k0018+580
Roads and bridges · 2025 · WTG CONSTRUCTION & DEVELOPMENT CORPORATION
₱48.0MOn-Going · 100%
Construction/maintenance of flood mitigation structures and drainage systems-construction of flood mitigation structure along package 2, A. gabuya st. to outfall
Flood control · 2025 · WTG CONSTRUCTION & DEVELOPMENT CORPORATION
₱96.4MOn-Going · 36%
Construction of multi-purpose building (phase iii), Barangay hipodromo, Cebu city cebu
Buildings · 2025 · POWER MOVE BUILDERS & CONSTRUCTION SUPPLY
₱4.9MOn-Going · 100%
Construction (completion) of multi-purpose building, Barangay binaliw
Buildings · 2025 · CARCEL CONSTRUCTION AND DEVELOPMENT CORPORATION
₱4.9MOn-Going · 97%
Construction/maintenance of flood mitigation structures and drainage systems-construction of flood mitigation structure along kinalumsan river
Flood control · 2025 · BNR CONSTRUCTION & DEVELOPMENT CORP. / CHAMARO CONSTRUCTION SERVICES
₱48.7MOn-Going · 90%
Construction of flood mitigation structure, Barangay sapangdaku, Cebu city (packa
Flood control · 2025 · GOWIL BUILDERS
₱26.2MOn-Going · 60%
Preventive maintenance - tertiary roads - borromeo st.-(s00079cb) - chainage 000 - chainage 645
Roads and bridges · 2025 · JJ&J CONSTRUCTION AND GENERAL SUPPLY CORPORATION
₱45.4MOn-Going · 96%
Construction/upgrading/rehabilitation of drainage along national roads-tertiary roads- gov cuenco ave -k0005+(-939)-k0005+(-188), (s00432cb) chainage 000-chainage 196
Flood control · 2025 · CORRO CONST. DEVELOPMENT AND TRADE CORPORATION
₱19.6MOn-Going · 78%
Construction/maintenance of flood mitigation structures and drainage systems- construction of drainage structure along salinas drive-cebu balamban transcentral highway
Flood control · 2025 · ON POINT CONSTRUCTION AND DEVELOPMENT CORPORATION
₱44.0MOn-Going · 57%
Construction of road, Barangay sudlon i
Roads and bridges · 2025 · TRI4 CONSTRUCTION & DEVELOPMENT CORP.
₱14.4MOn-Going · 98%
Construction of multi-purpose building (dormitory), Up cebu- university of the philippines system
Buildings · 2024 · CELJEM CONSTRUCTION & DEVELOPMENT CORP. / GONZALODO ENTERPRISES
₱39.8MOn-Going · 90%
Lgu hospitals-lapu lapu city hospital
Buildings · 2024 · ZLREJ TRADING AND CONSTRUCTION CORPORATION
₱14.8MOn-Going · 0%
Construction (completion) of multi-purpose building, Package a, Barangay duljo fatima
Buildings · 2025 · V.T.C CONSTRUCTION
₱4.9MOn-Going · 100%
Construction (completion) of multi-purpose building, Package a, Barangay labangon
Buildings · 2025 · V.T.C CONSTRUCTION
₱4.9MOn-Going · 29%
Preventive maintenance-tertiary roads- p burgos st-(s00116cb)-chainage 000-chainage 011, Chainage 011-chainage 083, Chainage 083 - chainage 218, (s00117cb) chainage 000-chainage
Roads and bridges · 2025 · POWER FRAME CONSTRUCTION & DEVELOPMENT CORP.
₱16.4MOn-Going · 100%
Construction of revetment along lusaran river, Barangay tagbao
Flood control · 2025 · BOOMETRIX DEVELOPMENT CORP.
₱43.4MOn-Going · 34%
Preventive maintenance-tertiary roads-cebu circumferencial rd (salvador st)-(s00066cb)- chainage 000-chainage 057, Chainage 057-chainage 1777, (s00067cb) chainage 000-chainage 6
Roads and bridges · 2025 · QUIRANTE CONSTRUCTION CORPORATION
₱48.9MOn-Going · 16%
Construction of road, Barangay sudlon ii
Roads and bridges · 2025 · INCEP CONSTRUCTION AND DEVELOPMENT CORP.
₱8.7MOn-Going · 11%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
PLANAC CONSTRUCTION69 projects · ₱371.6M
2
WTG CONSTRUCTION & DEVELOPMENT CORPORATION56 projects · ₱2.58B
3
BNR CONSTRUCTION & DEVELOPMENT CORP.46 projects · ₱2.82B
4
PLD CONSTRUCTION AND DEVELOPMENT INC.44 projects · ₱968.3M
5
SB & T CONSTRUCTION OPC43 projects · ₱270.2M