Llorente: Government

Municipality in Eastern Samar, Eastern Visayas, Visayas · 33 barangays

Town hall contracts

Construction contracts the town hall of Llorente awarded and posted on PhilGEPS.

226projects
₱487.4Min all
  • Roads and bridges ₱159.9M
  • Buildings ₱150.0M
  • Other ₱74.7M
  • Flood control ₱53.6M
  • Water ₱41.4M
  • Schools ₱7.8M

The last construction award Llorente posted on PhilGEPS is from March 2025. A town has to post every award, so the list below is likely not all of its work. The town's own reports are in "Town hall papers".

All

Showing 1 to 30 of 226

Rehabilitation of drainage system at brgy. 6-poblacion Flood control · 2025 · TWO-BROTHERS CONSTRUCTION
₱600K
Concreting of barangay road at brgy. hugpa Roads and bridges · 2025 · TWO-BROTHERS CONSTRUCTION
₱600K
Construction of road concrete pavement at brgys. hugpa, Naubay and canliwag Roads and bridges · 2025 · TWO-BROTHERS CONSTRUCTION
₱1.3M
Construction of solar powered street lights at municipal wide Roads and bridges · 2025 · TWO-BROTHERS CONSTRUCTION
₱2.0M
Construction of solar powered street lights at municipal wide Roads and bridges · 2025 · TWO-BROTHERS CONSTRUCTION
₱2.1M
Construction of wooden bridge at brgy. naubay Roads and bridges · 2025 · TWO-BROTHERS CONSTRUCTION
₱2.4M
Construction of solar powered street lights at municipal wide Roads and bridges · 2025 · TWO-BROTHERS CONSTRUCTION
₱3.7M
Expansion of water system level iii at brgy. 11-poblacion Water · 2025 · TWO-BROTHERS CONSTRUCTION
₱987K
Improvement of reproductive health clinic at brgy. 12-poblacion Other · 2024 · AMANHURAY CONSTRUCTION
₱120K
Construction of solar powered street lights at poblacion wide Roads and bridges · 2024 · AMANHURAY CONSTRUCTION
₱975K
Improvement of slaughter house at brgy. 01-poblacion Other · 2024 · AMANHURAY CONSTRUCTION
₱748K
Construction of evacuation center (completion) at brgy. 12-poblacion Buildings · 2024 · AMANHURAY CONSTRUCTION
₱9.2M
Improvement of water system at brgy. barobo Water · 2024 · AMANHURAY CONSTRUCTION
₱1.1M
Tourism site development phase ii at brgy. bacayawan Other · 2024 · AMANHURAY CONSTRUCTION
₱1.9M
Construction of multi-purpose hall at brgy. 07-poblacion Buildings · 2024 · AMANHURAY CONSTRUCTION
₱2.5M
Construction of drainage system at brgy. 11-escalo, Loste, San fernando, Borja sts, Lnhs Flood control · 2024 · AMANHURAY CONSTRUCTION
₱3.0M
Construction of cultural stage at brgy. bacayawan Other · 2024 · AMANHURAY CONSTRUCTION
₱599K
Construction of multi-purpose stage at brgy. naubay Other · 2024 · AMANHURAY CONSTRUCTION
₱1.5M
Construction of wharf at brgy. minaanod Other · 2024 · AMANHURAY CONSTRUCTION
₱6.0M
Repair/improvement of multi-purpose covered court at brgy. 5-poblacion Buildings · 2024 · R.B.NUNEZ CONSTRUCTION
₱3.0M
Construction of two-storey multi-purpose hall (completion) at brgy. 06-poblacion Buildings · 2024 · AMANHURAY CONSTRUCTION
₱1.0M
Repair/upgrading of rural health unit at brgy. 12-poblacion Other · 2024 · AMANHURAY CONSTRUCTION
₱5.0M
Construction of public cemetery (phase ii) at brgy. naubay Other · 2024 · G.I. AND 4K CONSTRUCTION
₱6.0M
Construction of solar powered street lights at municipal wide Roads and bridges · 2024 · AMANHURAY CONSTRUCTION
₱3.0M
Construction of drainage system at real st. extension Flood control · 2024 · AMANHURAY CONSTRUCTION
₱3.5M
Construction of road concrete pavement at boulevard, Brgy. 07-poblacion Roads and bridges · 2024 · AMANHURAY CONSTRUCTION
₱2.0M
Improvement of level ii water system (phase ii) at brgy. bacayawan Water · 2024 · R.B.NUNEZ CONSTRUCTION
₱1.4M
Construction of two (2) storey evacuation center (completion) at brgy. canliwag Buildings · 2024 · AMANHURAY CONSTRUCTION
₱444K
Construction of solar powered street lights at brgy. waso Roads and bridges · 2024 · AMANHURAY CONSTRUCTION
₱495K
Construction of road concrete pavement at brgy. 08-poblacion Roads and bridges · 2024 · STONE BUILDERS
₱989K

Source: PhilGEPS award notices, from the BetterGov.ph open data (CC0).

Town hall papers

Not every project is on PhilGEPS. These are the town's own reports.

1
Budget and 20% development fundDILG Full Disclosure Policy portal
2
Audit reportsCommission on Audit

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board.

Post on Talk →