National projects
126projects
₱4.66Bin all
24ongoing
7slow
- Roads and bridges ₱1.74B
- Buildings ₱1.30B
- Flood control ₱1.28B
- Schools ₱242.9M
- Other ₱82.3M
- Water ₱13.8M
Construction of multi-purpose building, Brgy. 1, San jose de buenavista
Buildings · 2024 · SENTINA CONSTRUCTION AND SUPPLY
₱19.7MOn-Going · 54%Slow
Construction of various facilities inside the camp fullon 602nd community defense center rcdg, And delta company 61st ib, Pa, San fernando
Buildings · 2024 · F. GURREA CONSTRUCTION, INCORPORATED
₱192.9MOn-Going · 0%Slow
Construction of convention center in badiang
Buildings · 2024 · J.E. TICO CONSTRUCTION CO., INC.
₱99.0MOn-Going · 21%Slow
Construction of brgy. comon- san pedro coastal road leading to san jose portand beaches, Resorts and sunset viewing, Antique (package 2)
Roads and bridges · 2024 · J.E. TICO CONSTRUCTION CO., INC.
₱96.5MOn-Going · 57%Slow
Construction (completion) of antique convention center, Brgy. badiang
Buildings · 2023 · J.E. TICO CONSTRUCTION CO., INC.
₱118.8MOn-Going · 58%Slow
Construction of antique breakwater structure along brgy. san angel to brgy. malaiba san jose, Antiqu
Flood control · 2022 · NEWBIG FOUR J CONSTRUCTION INC.
₱96.5MOn-Going · 39%Slow
Construction of antique breakwater structure along brgy. maybato south to brgy. maybato sur
Flood control · 2022 · NEWBIG FOUR J CONSTRUCTION INC.
₱96.5MOn-Going · 40%Slow
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
SETTLERS BUILDER12 projects · ₱149.5M
2
F & J GENERAL CONSTRUCTION AND SUPPLY CORPORATION10 projects · ₱181.2M
3
IBC INTERNATIONAL BUILDERS CORPORATION9 projects · ₱828.0M
4
J.E. TICO CONSTRUCTION CO., INC.5 projects · ₱396.6M
5
SENTINA CONSTRUCTION AND SUPPLY5 projects · ₱146.3M