Official seal of San Pedro City

San Pedro City: Government

City in Laguna, Calabarzon, Luzon · 27 barangays

National projects

Built by DPWH in San Pedro City since 2016.

299projects
₱7.27Bin all
43ongoing
10slow
  • Flood control ₱4.23B
  • Roads and bridges ₱1.38B
  • Buildings ₱1.02B
  • Schools ₱439.2M
  • Other ₱152.3M
  • Water ₱38.4M

Showing 31 to 43 of 43

Construction of riverbank protection structure at barangay calendola Flood control · 2024 · GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914)
₱47.7MOn-Going · 59%Slow
Construction of shore protection (near bay) at san pedro city, Laguna (phase 1) Flood control · 2024 · ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.
₱84.6MOn-Going · 36%Slow
Rehabilitation of revetment along tunasan river (staggered) Flood control · 2024 · D.T. RECIO INCORPORATED
₱96.4MOn-Going · 94%
Construction of riverbank protection structure at barangay cuyab Flood control · 2024 · AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129)
₱49.0MOn-Going · 86%
Construction of riverbank protection structure at barangay sto. nino Flood control · 2024 · ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.
₱47.7MOn-Going · 53%Slow
₱4.8MOn-Going · 0%Slow
Rehabilitation of road along conpil 1 subd., Barangay san lorenzo Roads and bridges · 2023 · BHENLLABIEN BUILDERS CORPORATION
₱9.4MOn-Going · 0%Slow
Construction of slope protection at barangay langgam Flood control · 2023 · MAR-VEL CONSTRUCTION & SUPPLY
₱103.0MOn-Going · 99%
Improvement - primary roads - manila south rd - k0030 + 150 Roads and bridges · 2022 · EOZ CONSTRUCTION
₱4.8MOn-Going · 0%Slow
Construction of shore protection along binan city Other · 2022 · ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
₱94.4MOn-Going · 80%
Rehabilitation of magsaysay road at barangay san antonio Roads and bridges · 2022 · EOZ CONSTRUCTION / POWER K CONSTRUCTION SUPPLY & SERVICES
₱48.2MOn-Going · 99%
₱9.6MOn-Going · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in San Pedro City since 2016.

1
11 DIAMOND EAGLE CONSTRUCTION CORPORATION43 projects · ₱491.2M
2
MICLOVER GENERAL CONSTRUCTION & IRON WORKS27 projects · ₱286.4M
3
DATZLAV CONSTRUCTION21 projects · ₱220.8M
4
MAR-VEL CONSTRUCTION & SUPPLY16 projects · ₱823.1M
5
EOZ CONSTRUCTION12 projects · ₱114.2M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →