National projects
2396projects
₱60.26Bin all
128ongoing
16slow
- Roads and bridges ₱31.00B
- Flood control ₱21.24B
- Buildings ₱5.76B
- Schools ₱1.37B
- Water ₱476.1M
- Other ₱412.3M
Showing 31 to 60 of 2,396
Concreting of barangay road, Barangay baraoas
Roads and bridges · San Fernando City · 2025 · KRYPTONITE 6S BUILDERS INC.
₱7.2MCompleted · 100%
Convergence and special support program - rainwater collector system
Water · San Gabriel · 2025 · SYNDTITE CONSTRUCTION CORPORATION
₱9.0MOn-Going · 78%
Construction of road at sitio centro, San fermin to kanubat, San jose, Launion
Roads and bridges · Caba · 2025 · E.E. MADAYAG CONSTRUCTION
₱24.0MCompleted · 100%
Const. of flood control structure along caba river basin, Brgy. gana, Lu
Flood control · Caba · 2025 · E.E. MADAYAG CONSTRUCTION
₱24.0MCompleted · 100%
Construction of flood control structure along aringay river basin, Barangay santa cecilla
Flood control · Aringay · 2025 · KRYPTONITE 6S BUILDERS INC.
₱67.2MOn-Going · 61%
Construction of flood control structure along aringay river basin, Package 3, Barangay anduyan
Flood control · Tubao · 2025 · VILLAR GENERAL CONSTRUCTION AND SUPPLIES
₱57.6MOn-Going · 52%
Const/rehab of flood mit. faci w/in major river basins & principal rivers - const. of flood mit. structure along aringay river basin, Brgy. poblacion, Lu (phase 3)
Flood control · Aringay · 2025 · UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES
₱93.5MCompleted · 100%
Const/rehab of flood mit. faci w/in major river basins & principal rivers - const. of flood mit. structure along aringay river basin, Brgy. san simon west, Lu (phase 2)
Flood control · Aringay · 2025 · UNIMAX STEEL STRUCTURE AND CONSTRUCTION CORP.
₱93.6MOn-Going · 100%
Const/rehab. of flood mit. faci w/in major river basins & principal rivers - const. of flood mit. structure along aringay river basin, Brgy. san juan west
Flood control · Aringay · 2025 · UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES
₱93.6MCompleted · 100%
Const/rehab of flood mit. faci w/in major river basin & principal rivers - const of folood mit. structure along aringay, River basin, Brgy. san simin east, Lu
Flood control · Aringay · 2025 · MG SAMIDAN CONSTRUCTION
₱93.6MOn-Going · 100%
Const/rehab of flood mit. faci w/in major river basins & principal rivers - const. of flood mit. structure along aringay river basin, Brgy. san simon west, Lu (phase 4)
Flood control · Aringay · 2025 · UNIMAX STEEL STRUCTURE AND CONSTRUCTION CORP.
₱93.6MOn-Going · 61%
Const/rehab of flood mit. faci w/in major river basins & principal rivers - const of flood mit. structure along aringay river basin, Brgy. poblacion aringay, Lu (phase 2)
Flood control · Aringay · 2025 · SILVERWOLVES CONSTRUCTION CORPORATION
₱93.6MCompleted · 100%
Const/rehab of flood mit. faci w/in major river basins & prin rivers - const. of flood mit structure along aringay river basin, Brgy. poblacion aringay, Lu (phase i)
Flood control · Aringay · 2025 · SILVERWOLVES CONSTRUCTION CORPORATION
₱93.6MOn-Going · 49%
Const/rehab of flood mit faci w/in major river basins & principal rivers - const. of flood mit structure along aringay river basin, Brgy. san simon west, Lu (phase 1)
Flood control · Aringay · 2025 · UNIMAX STEEL STRUCTURE AND CONSTRUCTION CORP.
₱93.6MOn-Going · 78%
Const/rehab of flood mit. faci w/in major river basins & principal rivers - const. of flood mit. structure along aringay river basin, Brgy. san sta. cecilia, Lu
Flood control · Aringay · 2025 · SILVERWOLVES CONSTRUCTION CORPORATION
₱93.6MOn-Going · 70%
Const/rehab of flood mit. faci w/in major river basins & principal rivers - const. of flood mit. structure along aringay river basin, Brgy. san simon west, Lu (phase 3)
Flood control · Aringay · 2025 · UNIMAX STEEL STRUCTURE AND CONSTRUCTION CORP.
₱92.7MOn-Going · 69%
Construction of rainwater collector systems (rwcs) - brgy hall, Sagayad, Csf, Lu - brgy hall, Narra oeste, Csf, Lu - brgy hall, Narra este, Csf, Lu - brgy hall, Ballogo, Bacnotan, Lu-brgy hall, Paagan, Bacnotan, Lu-san gabriel vocational hs, Lu
Water · San Gabriel · 2025 · RAPHAEIL CONSTRUCTION
₱2.5MCompleted · 100%
Construction of multi-purpose building, (fire station), Barangay ili norte
Buildings · San Juan · 2025 · J.A. OLIVAR ENGINEERING DESIGN, CONSTRUCTION AND SUPPLIES
₱9.6MCompleted · 100%
Rehabilitation/ reconstruction/ upgrading of damaged paved roads - tertiary roads - sn fernando - bagulin rd - k0272+000 - k0272+828
Roads and bridges · San Juan · 2025 · APP CONSTRUCTION AND SUPPLIES
₱19.7MCompleted · 100%
Construction (completion) of multi-purpose building, Barangay lipay sur
Buildings · San Gabriel · 2025 · H.G. LOPEZ CONSTRUCTION
₱2.9MCompleted · 100%
Construction of multi-purpose building, (fire station), Barangay poblacion
Buildings · Sudipen · 2025 · E.E. MADAYAG CONSTRUCTION
₱9.6MCompleted · 100%
Construction of multi-purpose building (teen center)
Buildings · San Fernando City · 2025 · RAPHAEIL CONSTRUCTION
₱19.2MCompleted · 100%
Completion of multi-purpose building, (zaragosa elementary school), Barangay zaragosa
Schools · Bacnotan · 2025 · RAPHAEIL CONSTRUCTION
₱3.9MOn-Going · 100%
Construction of flood mitigation structure along sitio pudoc, Brgy. alzate
Flood control · Bangar · 2025 · D.C. GALVEZ CONSTRUCTION
₱9.5MCompleted · 100%
Construction of slope protection, Brgy. cabaroan
Flood control · San Juan · 2025 · J.A. OLIVAR ENGINEERING DESIGN, CONSTRUCTION AND SUPPLIES
₱19.1MCompleted · 100%
Installation of solar lighting from brgy. urbiztondo to brgy. taboc
Roads and bridges · San Juan · 2025 · MCFL HARDWARE & CONSTRUCTION SUPPLIES
₱9.5MCompleted · 100%
Construction of multi-purpose building, Barangay poblacion
Buildings · Santol · 2025 · ARM-ASIA CONSTRUCTION & ENGINEERING
₱28.8MOn-Going · 90%
Construction of flood mitigation structure along brgy. napaset
Flood control · Luna · 2025 · RAPHAEIL CONSTRUCTION
₱9.1MCompleted · 100%
Preventive maintenance- tertiary roads, Sn fernando-bagulin rd-chainage 0 to chainage 2680 and chainage 3632 to chainage 4885
Roads and bridges · Bagulin · 2025 · A.I.P. CONSTRUCTION
₱149.8MOn-Going · 81%
Construction of multi-purpose building (sb building), Barangay poblacion
Buildings · Luna · 2025 · ARM-ASIA CONSTRUCTION & ENGINEERING
₱14.4MOn-Going · 77%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
E.E. MADAYAG CONSTRUCTION384 projects · ₱3.04B
2
VILLAR GENERAL CONSTRUCTION AND SUPPLIES239 projects · ₱3.29B
3
J.A. OLIVAR ENGINEERING DESIGN, CONSTRUCTION AND SUPPLIES156 projects · ₱1.16B
4
ARM-ASIA CONSTRUCTION & ENGINEERING82 projects · ₱698.9M
5
ALPHATEC CHEMICAL CORPORATION76 projects · ₱1.91B