Official seal of Taguig City

Taguig City: Government

City in Metro Manila, Luzon · 38 barangays

National projects

Built by DPWH in Taguig City since 2016.

984projects
₱50.74Bin all
148ongoing
24slow
  • Buildings ₱26.04B
  • Flood control ₱14.06B
  • Roads and bridges ₱8.12B
  • Other ₱1.60B
  • Schools ₱917.2M

Showing 1 to 30 of 769

₱9.8MCompleted · 100%
Rehabilitation of road at barangay wawa Roads and bridges · 2025 · DAHL CONSTRUCTION CORP.
₱9.4MCompleted · 100%
Rehabilitation of road and alley at barangay bambang Roads and bridges · 2025 · B. VALENCERINA TRADING & CONSTRUCTION
₱9.4MCompleted · 100%
Construction of slope protection structure along c-6 open channel (phase 12) Flood control · 2025 · BLISSFUL CONSTRUCTION INCORPORATED / TUCHAR CONSTRUCTION CORP.
₱93.8MCompleted · 100%
Construction of taguig general hospital (phase 13) Buildings · 2025 · THAISON BUILDER AND DEVELOPER INC.
₱72.0MCompleted · 100%
Construction of taguig general hospital (phase 12) Buildings · 2025 · THAISON BUILDER AND DEVELOPER INC.
₱96.0MCompleted · 100%
Preventive maintenance-tertiary roads-south super h-way west service rd-k0011+(-384)-k0012+544 Roads and bridges · 2025 · ALE BUILDERS CONSTRUCTION AND DEVELOPMENT CORP.
₱121.1MCompleted · 100%
₱26.9MCompleted · 100%
Construction of slope protection along c-6 open channel (phase 18) Flood control · 2025 · TOUGHBUILT CONSTRUCTION & TRADING, INC.
₱94.6MCompleted · 100%
Construction of slope protection along taguig river lakeshore area (phase 2) Flood control · 2025 · TOUGHBUILT CONSTRUCTION & TRADING, INC.
₱94.6MCompleted · 100%
Construction of slope protection along taguig river lakeshore area (phase 3) Flood control · 2025 · TOUGHBUILT CONSTRUCTION & TRADING, INC.
₱94.6MCompleted · 100%
Construction of slope protection along c-6 open channel (phase 17) Flood control · 2025 · J. SIMEON CONSTRUCTION
₱94.6MCompleted · 100%
Construction of slope protection along c-6 open channel (phase 16) Flood control · 2025 · RVR3 CONSTRUCTION SUPPLY AND SERVICES
₱94.5MCompleted · 100%
Construction of slope protection along c-6 open channel (phase 12) Flood control · 2025 · RVR3 CONSTRUCTION SUPPLY AND SERVICES
₱94.6MCompleted · 100%
Construction of slope protection along c-6 open channel (phase 15) Flood control · 2025 · RVR3 CONSTRUCTION SUPPLY AND SERVICES
₱94.5MCompleted · 100%
Construction of slope protection along c-6 open channel (phase 13) Flood control · 2025 · RVR3 CONSTRUCTION SUPPLY AND SERVICES
₱94.6MCompleted · 100%
Construction of slope protection along c-6 open channel (phase 14) Flood control · 2025 · RVR3 CONSTRUCTION SUPPLY AND SERVICES
₱94.5MCompleted · 100%
Construction of slope protection along laguna lakeshore (package 9) Flood control · 2025 · RVR3 CONSTRUCTION SUPPLY AND SERVICES
₱94.5MCompleted · 100%
Rehabilitation of road at barangay central bicutan Roads and bridges · 2025 · C.L. MORALES CONSTRUCTION AND TRADING
₱13.7MCompleted · 100%
Retrofitting/strengthening of permanent bridge - mauling br. (b01883lz) along ppta rd Roads and bridges · 2025 · Q-R BUILDING SOLUTIONS CORPORATION
₱4.8MCompleted · 100%
Retrofitting/strengthening of permanent bridge - hagonoy br. (b01881lz) along ppta rd Roads and bridges · 2025 · Q-R BUILDING SOLUTIONS CORPORATION
₱4.8MCompleted · 100%
Construction (completion) of multi-purpose building (health center) at barangay maharlika Buildings · 2025 · MEGA-ANT BUILDERS AND CONSTRUCTION SUPPLIES
₱9.4MCompleted · 100%
Rehabilitation of road and alleys at barangay tuktukan Roads and bridges · 2025 · B. VALENCERINA TRADING & CONSTRUCTION
₱4.8MCompleted · 100%
Rehabilitation of road network at barangay hagonoy Roads and bridges · 2025 · B. VALENCERINA TRADING & CONSTRUCTION
₱9.5MCompleted · 100%
Rehabilitation of road network at barangay katuparan Roads and bridges · 2025 · C.L. MORALES CONSTRUCTION AND TRADING
₱13.7MCompleted · 100%
Rehabilitation of multi-purpose building, Purok 6 amba pedong, Barangay palingon-tipas Buildings · 2025 · B. VALENCERINA TRADING & CONSTRUCTION
₱9.8MCompleted · 100%
Construction (completion) of dpwh health center, Barangay central bicutan Buildings · 2025 · HONY TRADING & CONSTRUCTION
₱14.1MCompleted · 100%
Construction of drainage structure along alfredo street, Barangay lower bicutan Flood control · 2025 · J.M.L.R. CONSTRUCTION AND SUPPLY
₱14.1MCompleted · 100%
₱13.9MCompleted · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Taguig City since 2016.

1
HONY TRADING & CONSTRUCTION61 projects · ₱1.49B
2
DAHL CONSTRUCTION CORP.52 projects · ₱2.68B
3
FRANZCOR TRADING & CONSTRUCTION52 projects · ₱946.8M
4
B. VALENCERINA TRADING & CONSTRUCTION36 projects · ₱317.9M
5
TUCHAR CONSTRUCTION CORP.29 projects · ₱764.1M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →